Aerodrome Annex 14 Analysis & Reporting Services in South Africa 

Any structure within 15km of an aerodrome is required by the CAA to have an Annex 14 Analysis and report alongside your Obstacle Analysis.

CAA obstacle approval CA139-27

CA139-27 Submission Ready Reports

SACAA Obstacle Assessment Specialists

How We Assess Your Aerodrome's Annex 14 Compliance

ANNEX 14 Analysis & reporting 

An Annex 14 Analysis applies whether you operate the aerodrome or you're building near one. We map the Annex 14 obstacle limitation surfaces around the runway, then check whether the aerodrome itself, or a structure proposed nearby, such as a turbine, mast, building, or powerline, sits inside them. We also check the communication, navigation, and surveillance infrastructure, along with air traffic management and airspace, so the analysis covers more than physical clearance. You get a report that names any penetration or risk in plain terms and sets out what to change to fix it.

Request an Annex 14 Analysis

our analysis process

Here's how the process works and what you will get

01

An aerodrome is being planned, upgraded, or certified

02

An aerodrome is due for a compliance audit or safeguarding review

03

A runway is being extended or its operations are changing

04

Wind turbines, masts, a solar facility, buildings, or powerlines

SOMETHING TO NOTE

We structure every Annex 14 report to go straight into a planning submission or regulatory approval process, findings and fixes included, so nothing needs to be reworked before it can be used.

Speak to our certified team

the analysis scope

What a Complete Annex 14 Analysis Actually Covers

CHECK 01 — AIRSPACE & SURFACES

Annex 14 Obstacle Limitation Surfaces

The aerodrome or proposed structure is checked against the Annex 14 obstacle limitation surfaces, the protected zones extending out from the runway. Any penetration or risk is named specifically, not flagged as a general concern.

What you get:

A written breakdown of exactly where the protected airspace is affected, and by how much.

CHECK 02 — SYSTEMS & AIRSPACE

The Aviation Airspace Concept

The analysis also checks against the wider Aviation Airspace Concept, covering communication, navigation, and surveillance infrastructure, plus air traffic management and the route network structure.

What you get:

Clear mitigation where there's a risk, a height limit, repositioning, marking, lighting, or an operational restriction, built to go straight into a planning submission or regulatory approval process.